Training & commissioning

Give the team a clear start.

Prepare operators and project teams to use the equipment within the agreed lift methodology and site procedures.

A worker in a yellow safety vest is on a scissor lift, installing or maintaining a large, square device using a crane with a long arm. The background is overcast, with a gray sky.

Practical preparation

Understand the controls before the lift.

  • Equipment familiarisationSystem functions, pendant operation, status indications and pre-use checks.
  • Control and handoverCommanded rotation, position hold, memory settings and dual-controller switching.
  • Site integrationCommunication, charging, equipment care and the planned lifting sequence.
  • Refresher and project supportDiscuss further training needs as crews, projects or applications change.
  1. Define the team

    Equipment, participant roles, project and location.

  2. Agree the scope

    Familiarisation, commissioning and application needs.

  3. Prepare the equipment

    Review setup, inspection and relevant documents.

  4. Support deployment

    Practical guidance and follow-up support.

Plan training with your deployment.

Tell us the system, project location, participant group and preferred dates.